construction photo

One Capital Project Complete, One to Go

The district contracted with Diamond Contracting Corp. to replace the sanitary sewer main in S. Everett Way. This project started in mid-July and is now complete. Diamond is currently working on the water main replacement in S. Kipling St. from just north of W. Coal Mine Ave. to just south of W. Fair Ave. Project details are as follows:

Water Main Replacement – In progress

S. Kipling Street – This project will replace 2,239 feet of 16-inch ductile iron pipe with 16-inch PVC water pipe in S. Kipling St. from south of W. Fair Ave. to just north of W. Coal Mine Ave.

Construction started Monday, August 29 and is anticipated to take approximately two months. During construction, valve operation may cause disruption of flow which loosens rust particles and sediment on old valves which can cause temporary discoloration in the water.

Affected neighborhoods include: Foothill Green, Powderhorn, Stanton Farms, Alpers Farm, Kipling Hills, Kipling Sun, Kipling Villas and Woodmar.

Sewer Main Replacement – Complete

S. Everett Way – This project replaced 227 feet of 8-inch PVC sewer pipe with 8-inch PVC sewer pipe in S. Everett Way between 6449 S. Everett Way and 6489 S. Everett Way in the Woodmar Village subdivision.


The above referenced projects were strategically scheduled for 2022 using certain criteria identified in the Capital Master Plan (Plan). This Plan allows the district to be proactive rather than reactive when dealing with asset replacement and rehabilitation needs.